Construction quality guides

    Straight answers to the questions that come up on site — each one written from the regulation, not from a warranty document.

    • Minimum DPC height above ground level

      The 150mm rule, what counts as finished ground level, and the site conditions that quietly bridge it.

      3 key figures · reviewed 2026-08-21

    • Wall tie spacing in cavity masonry

      The standard grid, the tighter spacing at every opening, and the installation faults that make correct spacing worthless.

      4 key figures · reviewed 2026-08-21

    • Pre-plaster inspection checklist

      The last honest look at everything that gets buried. Once boards are on, every one of these becomes a demolition job.

      3 key figures · reviewed 2026-08-21

    • Cavity trays: where they go and how they fail

      A tray without stop ends is a gutter with the ends cut off. The details that decide whether water leaves the cavity or enters the house.

      3 key figures · reviewed 2026-08-21

    • Private stairs: rise, going and headroom

      The geometry is simple and unforgiving. Get the floor-to-floor dimension wrong and the whole flight is wrong.

      5 key figures · reviewed 2026-08-21

    Related references

    We use cookies to keep you logged in and improve ProPlot. Privacy Policy