Critical construction dimensions

    The numbers that get checked on site — each one stated plainly and cited to the regulation behind it.

    Topics

    Cavity and weather resistance
    Damp proofing and DPC
    Drainage and below ground
    Fire stopping and compartmentation
    Fixings and restraint
    Services penetrations
    Stairs and guarding
    Structural spans and bearings
    Thermal and insulation
    Timber frame
    Tolerances and setting out
    Ventilation
    Browse topic pages
    England
    Wales
    Scotland
    Northern Ireland
    Site setup and storage
    Substructure and foundations
    Below-ground drainage
    Ground floor and slab
    Superstructure
    Timber frame erection
    Upper floors
    Roof structure and covering
    Windows and external doors
    Insulation and airtightness
    Fire stopping and compartmentation
    First fix
    Pre-plaster inspection
    Plaster and dry lining
    Second fix
    Paint and finishing
    Externals and handover

    174 of 174 dimensions

    Site setup and storage

    Substructure and foundations

    Below-ground drainage

    Ground floor and slab

    Superstructure

    Timber frame erection

    Upper floors

    Roof structure and covering

    Windows and external doors

    Insulation and airtightness

    Fire stopping and compartmentation

    First fix

    Pre-plaster inspection

    Plaster and dry lining

    Second fix

    Externals and handover

    These entries are our own editorial summaries of publicly available regulation. They are not building control approval, a warranty determination, or a substitute for the full source document.

    We use cookies to keep you logged in and improve ProPlot. Privacy Policy