exact
    England

    Temperature limits for cold weather working

    2 °C

    Construction work should not proceed if the air temperature is, or is forecast to fall below, 2°C, unless specific cold weather precautions are rigorously implemented

    Construction work should not proceed if the air temperature is, or is forecast to fall below, 2°C, unless specific cold weather precautions are rigorously implemented. Accurate temperature monitoring using a shaded thermometer is essential to inform decisions on when to commence or halt work.

    Basis in regulation

    How to check it on site

    Check that a shaded thermometer is correctly located and regularly monitored, and that works are paused or protected if temperatures fall below thresholds.

    Common failure

    Continuing work in low temperatures without adequate protection, or relying on inaccurate temperature readings.

    Last updated 23 August 2026. This is our editorial summary of publicly available regulation, not building control approval or a warranty determination.

    We use cookies to keep you logged in and improve ProPlot. Privacy Policy