Manage AM and PM Site Activities on a Single Day
Generic scheduling apps can't handle concurrent tasks. ProPlot's split-day editor lets you book wardrobes in the morning and inspections in the afternoon — without breaking your master auto-program. Digital daily diary with AM/PM split-view segments.
Join the BetaStandard Scheduling vs. ProPlot Split-Day
| Feature | Standard Apps | ProPlot |
|---|---|---|
| AM/PM split scheduling | ||
| Concurrent task support | ||
| Anchored entries (slip-proof) | ||
| Foundation type filtering | ||
| Quick book inspections | ||
| Excel gradient fill export | ||
| Mobile split-day editor | ||
| Doesn't break auto-program |
Real-World Split-Day Scenarios
AM/PM Inspections
Log AM/PM NHBC inspections in two taps. Book your LABC morning visit and your afternoon air test without overlapping your master schedule. Tactical site manager tool for daily hand-offs.
Concurrent Trades
How to track concurrent trades on a 50-plot site: wardrobes AM, joinery PM. ProPlot's split-day editor manages both without programme clutter. Quick book wardrobes and inspections.
Utility Connections
Mobile app for booking AM/PM utility connections. Gas, electric, and water fits can be slotted into half-day blocks alongside your regular programme activities.
FAQs
What is split-day scheduling?
Book AM and PM activities separately — wardrobes morning, inspections afternoon — without cluttering your master program.
Does it break the auto-program?
No. Split-day entries are anchored to specific dates. The Slip tool recalculates around them.
Can I log AM/PM inspections in two taps?
Yes. The fast-entry activities menu lets you book into AM or PM slots with just two taps.
High-Resolution Daily Scheduling
AM/PM split-day editing for finishing managers. Tactical, fast, and never breaks your master program.
Start Your Free Trial