Building Control Guide

    BREL Report Requirements for Part L Photographic Evidence

    Site managers need more than a folder of random photos. Building Control expects Part L photographic evidence that proves insulation, thermal bridging and air-tightness details were installed before they were covered.

    Capture Part L Evidence

    Clear proof

    Take wide and close-up shots so the plot, location and construction detail are obvious.

    Traceable location

    Tag every image to the plot, stage, room or elevation so the assessor can match evidence to the SAP/BREL file.

    Before cover-up

    Capture evidence before plasterboard, screed, cladding or finishes hide the Part L detail.

    What photos should go into a BREL evidence pack?

    Foundation and floor insulation before cover-up

    External wall insulation continuity and cavity closer details

    Roof, loft and sloping ceiling insulation before plasterboard

    Thermal bridge details at lintels, sills, corners and party walls

    Air-tightness details around service penetrations and junctions

    Heating, ventilation and renewable system installation evidence

    How to make Part L photographic evidence acceptable

    Capture evidence by plot and stage, not by the date on your camera roll. Each photo should answer four questions: what plot is this, what detail is shown, when was it taken, and was the work visible before cover-up? If any of those answers are missing, the BREL report can become a time-consuming manual exercise.

    ProPlot keeps Part L photographic evidence tied to the plot and inspection stage as it is captured. That makes it easier to build a clean handover pack for Building Control without searching through WhatsApp images, email attachments or unnamed site folders.

    Turn site photos into a cleaner BREL workflow

    Use ProPlot to capture GPS-tagged, stage-tagged evidence while the detail is still visible.

    Join the Beta

    We use cookies to keep you logged in and improve ProPlot. Privacy Policy