One-Tap Slip Tool
Trade no-show? Weather delay? Slip 100+ plot programs in one second. Every CML date recalculates instantly.
Manage your entire 52-week program from your palm. Whether it's shifting 100+ plots after a trade no-show or toggling between piling and trench foundations, ProPlot's masonry-first engine handles the technical heavy lifting — so you don't have to wrestle with Excel formulas at 7pm.
Create a Free AccountEvery site manager knows these frustrations. ProPlot was built to eliminate them.
2+ hours recalculating dates after a delay
→ One-tap slip tool — 100+ plots in 1 second
Broken Excel formulas cascading across sheets
→ 91-stage engine with auto-recalculation
No visibility on CML targets after slips
→ Real-time CML forecasting dashboard
Foundation type changes = rebuilding the schedule
→ Dynamic piling/trench switching per plot
Can't manage the programme from the field
→ Full mobile schedule editor on Android
Directors asking for progress — no data ready
→ One-click board-ready Excel export
From auto-generation to forensic delay evidence — everything below is included in the programme module.
Trade no-show? Weather delay? Slip 100+ plot programs in one second. Every CML date recalculates instantly.
Auto-generate a complete 52-week build program from foundations to CML. 91 stages, zero Excel formulas.
Switch between piling and trench foundations per plot. The program recalculates every downstream date automatically.
Visual progress tracking from foundations to legal completion. Real-time CML date forecasting after every slip.
Auto-generated 52-week construction program for residential masonry builds. Bank holiday aware, concurrent task limits.
Set a start date, choose your house type, and ProPlot generates the entire programme — including foundation-specific stages.
Quick-edit your construction calendar from the field. No laptop needed — full programme control on Android.
34 internal fit-out stages per plot. Rapid-fire updates for second fix, kitchens, and snagging.
Track every plot from foundations to CML on a single dashboard. Colour-coded stages, instant visibility.
Export your entire programme history to professional .xlsx files. Colour-coded, formatted, board-ready.
Not a generic Gantt chart. A construction-specific scheduling engine.
ProPlot knows the difference between a 4th lift and a gable end. The 91-stage engine schedules scaffolding, brickwork, and roof tiling in the correct sequence — not a generic task list.
When a bricklayer no-shows on Plot 23, ProPlot recalculates the CML date for that plot and every downstream milestone. Directors see accurate forecasts, not optimistic guesses.
ProPlot skips UK bank holidays automatically when generating programmes. No more manually checking calendars or discovering you've scheduled brickwork on Christmas Day.
A 91-stage masonry build engine auto-generates a 52-week programme. It handles bank holidays, concurrent task limits, foundation switching, and real-time CML forecasting.
One tap recalculates every downstream date across 100+ plots. Select a delay reason and number of days — every CML date and milestone updates instantly.
Yes. Dynamic switching between trench and piling per plot. The programme recalculates automatically.
Yes. Auto-generation, mobile editing, one-tap slipping, and professional Excel exports — everything Excel does, faster and without the formula breakage.
91-stage engine. One-tap slip tool. Dynamic foundations. CML forecasting. Mobile editing. Excel exports. No per-user charges. No per-plot limits.
Free to use during the beta.
Discover how ProPlot covers every corner of UK site management.
Part L photographic evidence requirements.
Cut evening admin and automate reporting.
Build, slip and share 52-week programmes.
NHBC inspections, Part L evidence and audit trails.
Offline audits, GPS snagging and contractor portals.
Get practical tips for UK site managers — programme hacks, compliance shortcuts and feature updates. No spam.