Replace your Excel programme

    Construction 52-Week Planner App for Residential Plots

    Your Excel spreadsheet can't reschedule 100 plots when weather delays hit. ProPlot's 52-week scheduling engine generates, slips, and exports your build programme — with backward planning, split-day bookings, and live contractor sharing built in.

    Why Site Managers Are Ditching Excel

    Auto-Fill Scheduling

    Pick a house type template with stage durations. Set a start date. The engine generates the full programme, auto-skipping weekends and bank holidays. Supports external, internal, and combined schedules.

    The Slip Tool

    One delay? Select the reason and number of days — the Slip tool recalculates every affected plot instantly. Stage dependencies maintained. Delay reason logged forensically. Excel can't do that.

    Backward Planning

    Set your target completion date and ProPlot reverse-calculates the internal start, anchoring your external roof finish. Select specific anchor and end stages for precision control.

    ProPlot vs Excel Spreadsheets

    Excel was built for accountants. ProPlot was built for site managers.

    FeatureExcel SpreadsheetsProPlot
    52-week programme generationManual cell-by-cell entryAuto-fill from stage templates
    Delay reschedulingManually update every rowSlip tool — 100+ plots in one second
    Backward planningComplex formulasBuilt-in reverse calculation from target date
    Split-day concurrent tasksImpossible to representAM/PM booking with anchored overrides
    Bank holiday awarenessManual checkingAuto-skips UK bank holidays
    Contractor schedule sharingEmail the spreadsheetLive filtered portals — always up to date
    Delay reason trackingNotes columnForensic slip log with timestamps
    Status history exportNot feasibleProfessional .xlsx with dedicated worksheets
    Offline mobile accessNoNative Android shell with full offline
    PriceFree but hours of adminFree in beta — hours saved weekly

    Full 52-Week Programme Toolkit

    Auto-fill from 91-stage masonry templates
    Backward planning from target completion dates
    Slip tool — reschedule 100+ plots in one tap
    Split-day AM/PM concurrent task booking
    Bank holiday and weekend auto-skip
    Per-flat scheduling with cascade gap indicators
    Communal stage pinning during slips
    Professional Excel export with slip history
    Live contractor schedule sharing
    Offline access via native Android shell

    Frequently Asked Questions

    Can I import my existing Excel programme?

    ProPlot uses stage-based templates that generate programmes faster than manual import. Set up your house types with stage durations once, then auto-fill any plot in seconds. Most users are fully migrated within a day.

    What if I need to export for my build director?

    ProPlot exports professional .xlsx workbooks with per-plot schedules, frozen headers, autofilters, and dedicated worksheets for status history and slip logs. Your director gets better data than any manual spreadsheet could provide.

    Does it handle different house types?

    Yes. Create multiple house type templates with different stage sequences and durations. Assign house types to plots and the auto-fill engine uses the correct template. Foundation type filtering ensures only relevant stages appear.

    Your Programme Deserves Better Than Excel

    52-week scheduling engine with auto-fill, slip tracking, and professional exports.

    Start Your Free Trial