Forensic delay tracking

    Track Construction Site Delay Reasons With Excel History Export

    Site Audit Pro gives you a list of snags. ProPlot gives you a forensic history of why the plot slipped — Weather, Trade no-show, Material delay — in professional Excel exports your build director can use to defend programme claims.

    From Delay to Defence in Three Steps

    1. Record the Delay

    Select the reason — Weather, Trade no-show, Material delay, or a custom reason — and the number of days. The Slip tool instantly recalculates all affected plot dates.

    2. Build the History

    Every slip event is timestamped and logged with the reason, days slipped, contractor name, and affected plots. This builds a forensic audit trail over the life of your project.

    3. Export for Directors

    Generate professional Excel workbooks with Status History and Slip Log worksheets. Frozen headers, autofilters, and site-branded formatting ready for boardroom presentations.

    Side-by-Side Comparison

    Generic audit tools track snags. ProPlot tracks why your programme slipped.

    FeatureSite Audit ProProPlot
    Delay reason trackingNot availableWeather, Trade no-show, Material delay + custom
    Slip history exportNoDedicated Excel worksheet with full log
    Status historyNoPlot-by-plot status transitions with timestamps
    Programme integrationNoneDelays auto-update the 52-week programme
    Forensic audit trailSnag list onlyReason, days slipped, contractor, date — all logged
    Director-ready reportsBasic PDFProfessional .xlsx with autofilters & frozen headers
    Offline operationWeb-reliantFull offline with auto-sync
    Price£50–£150+/moFree in beta

    Frequently Asked Questions

    How does ProPlot cross-reference delays with status changes?

    The export system cross-references status transitions with slip logs using plot ID and a 10-minute timestamp window. This creates a correlated timeline showing exactly how each delay event impacted the programme.

    Can I track multiple delay reasons for one plot?

    Yes. Each slip event is recorded independently with its own reason, date, and contractor reference. Over the course of a project, you build a complete history of every delay that affected each plot.

    What format are the exports?

    Professional .xlsx (Excel) files with site-branded headers, frozen rows for navigation, autofilters for sorting, and separate worksheets for status summary and detailed slip logs.

    Give Your Directors the Data They Need

    Forensic delay tracking with professional Excel exports — built for UK construction.

    Start Your Free Trial