Switch Between Piling and Trench — Instantly Update Your Program
Dynamic foundation type tracking for plot schedules. ProPlot switches between trench, piling, and custom foundation sequences per plot. Fast-track piling and trench foundation schedules with automatic program recalculation.
Join the BetaExcel vs. ProPlot Foundation Scheduling
| Feature | Excel | ProPlot |
|---|---|---|
| Dynamic foundation switching | ||
| Mixed types on one site | ||
| Auto program recalculation | ||
| Stage filtering per type | ||
| Custom foundation sequences | ||
| Split-day type awareness | ||
| Mobile foundation editing | ||
| Colour-coded by type |
How Foundation Logic Works
Per-Plot Foundation Types
Assign trench or piling logic to each plot individually. Mixed foundation types on the same site — ProPlot handles the stage sequence differences automatically.
Instant Program Recalculation
Change a plot's foundation type and the entire build program recalculates. No manual date editing, no broken formulas. Real-time schedule adjustments for complex substructure builds.
Smart Stage Filtering
The split-day editor and programme view filter stages based on foundation type. Piling plots show piling stages; trench plots show trench stages. No clutter.
FAQs
How does ProPlot handle different foundation types?
Dynamic switching between trench and piling per plot. Change the type and the entire build program recalculates automatically.
Can I have mixed foundation types on the same site?
Yes. Different plots can have different foundation logic — ProPlot handles mixed types with separate stage sequences.
Does foundation type affect the split-day editor?
Yes. Available stages are filtered by foundation type, preventing irrelevant stages from cluttering your schedule.
Your Foundations, Your Logic
Dynamic foundation type switching with instant program recalculation. Built for complex sites.
Start Your Free Trial