Foundation Logic

    Switch Between Piling and Trench — Instantly Update Your Program

    Dynamic foundation type tracking for plot schedules. ProPlot switches between trench, piling, and custom foundation sequences per plot. Fast-track piling and trench foundation schedules with automatic program recalculation.

    Join the Beta

    Excel vs. ProPlot Foundation Scheduling

    FeatureExcelProPlot
    Dynamic foundation switching
    Mixed types on one site
    Auto program recalculation
    Stage filtering per type
    Custom foundation sequences
    Split-day type awareness
    Mobile foundation editing
    Colour-coded by type

    How Foundation Logic Works

    Per-Plot Foundation Types

    Assign trench or piling logic to each plot individually. Mixed foundation types on the same site — ProPlot handles the stage sequence differences automatically.

    Instant Program Recalculation

    Change a plot's foundation type and the entire build program recalculates. No manual date editing, no broken formulas. Real-time schedule adjustments for complex substructure builds.

    Smart Stage Filtering

    The split-day editor and programme view filter stages based on foundation type. Piling plots show piling stages; trench plots show trench stages. No clutter.

    FAQs

    How does ProPlot handle different foundation types?

    Dynamic switching between trench and piling per plot. Change the type and the entire build program recalculates automatically.

    Can I have mixed foundation types on the same site?

    Yes. Different plots can have different foundation logic — ProPlot handles mixed types with separate stage sequences.

    Does foundation type affect the split-day editor?

    Yes. Available stages are filtered by foundation type, preventing irrelevant stages from cluttering your schedule.

    Your Foundations, Your Logic

    Dynamic foundation type switching with instant program recalculation. Built for complex sites.

    Start Your Free Trial