Mobile Construction Schedule Editor for Site Managers
Your programme shouldn't live on a desktop in the site office. ProPlot's mobile schedule editor puts your entire 52-week programme in your pocket — with masonry stage tracking, batch updates, and one-tap slip rescheduling from your Android phone.
Your Programme, On Your Phone
Sticky Mobile Toolbar
Persistent access to Slip and Generate controls on every screen. No scrolling to find buttons. The toolbar stays within thumb reach — designed for one-handed phone use on site.
91-Stage Masonry Tracking
View each plot's full lifecycle — foundation, brickwork, roof, first fix, second fix, CML. Filter stages by foundation type. Track internal fit-out with cascade gap indicators.
One-Tap Operations
Slip 100+ plots in one second. Auto-fill from templates. Book split-day concurrent trades. Batch update stages. Every operation is optimised for mobile speed.
Desktop-First vs Mobile-First
Your phone is on the plot. Your laptop is in the office.
| Feature | Desktop-First Tools | ProPlot |
|---|---|---|
| Mobile schedule editing | Responsive afterthought | Mobile-first with sticky toolbar |
| Masonry stage tracking | Generic categories | 91-stage engine: foundation → CML |
| Batch stage updates | Desktop only | Bulk operations from your phone |
| Internal fit-out tracking | No stage awareness | Dedicated internal programme with cascade gaps |
| Quick programme changes | Navigate to desktop | One-tap Slip from any screen |
| Offline editing | Not available | Full offline with native storage |
| GPS photo capture | Separate camera app | Native camera with auto-tagging |
| Contractor sharing | Email from laptop | WhatsApp from your phone |
| Split-day booking | Not possible | AM/PM concurrent tasks from mobile |
| Price | £100+/mo | Free in beta |
Mobile Schedule Features
Frequently Asked Questions
Can I manage the full programme from just my phone?
Yes. Every programme feature — Generate, Slip, split-day booking, stage updates, backward planning — works on mobile. The sticky toolbar ensures key controls are always accessible. Most site managers never need to open a laptop for day-to-day programme management.
How does internal fit-out tracking work on mobile?
The programme shows internal stages with cascade gap indicators on your phone screen. You can auto-fill individual flats, book split-day tasks, and track progress through 1st Fix, Plaster, 2nd Fix, and CML — all with thumb-friendly controls.
Is the mobile experience a cut-down version?
No. ProPlot is mobile-first, not mobile-lite. Every feature available on desktop works on your phone. The interface is designed for mobile from the ground up — not a desktop app squeezed onto a small screen.
Your Programme Belongs in Your Pocket
Mobile-first schedule editing built for construction site reality.
Start Your Free Trial