Document wall ties, lintels, DPC, and structural timber with GPS-tagged photographic evidence before they're hidden behind finishes. Built for UK site managers.
These structural components are progressively hidden as the build advances. Capture the evidence while it's visible.
Document wall tie spacing, cavity width, insulation board installation, and mortar joint quality at superstructure stage.
Photograph lintel positions, bearings, and cavity tray installation above every opening — evidence that's hidden once renders and finishes are applied.
Capture DPC positioning, lapping details, and integration with DPM from foundation stage. Verify continuity across the building envelope.
Document timber grades, joist hangers, steel beam positions, and connections before they're concealed behind boarding and finishes.
Evidence fire stopping, acoustic treatment, and structural integrity of party walls between dwellings before finishing trades begin.
Capture truss installation, bracing, strapping, and roof membrane details before tiling begins. Include gang nail and connection close-ups.
The superstructure phase is when the most critical structural elements of a dwelling are installed — and then progressively concealed. Wall ties are covered by the outer leaf, lintels disappear behind renders, and structural timber connections are hidden by boarding. Without photographic evidence captured at the right time, there's no way to verify compliance later.
ProPlot's superstructure inspection features let site managers capture evidence as each element is installed. Every photo is GPS-tagged and linked to the correct plot — so your NHBC inspector can see exactly what was installed, where, and when.
For housebuilders building to NHBC Buildmark standards, having a verifiable superstructure evidence trail protects against warranty claims. If a structural issue surfaces years after completion, your GPS-verified photos prove exactly how construction was carried out.
The NHBC superstructure inspection covers the main structural elements of a new dwelling — walls, floors, roof structure, lintels, DPC, and structural connections. The NHBC inspector checks that these elements meet Buildmark standards before they're concealed by finishes and decorations.
Superstructure elements are large, complex, and progressively concealed as the build advances. Wall ties disappear behind the outer leaf, lintels are covered by renders, and timber connections are hidden by boarding. ProPlot helps you capture evidence at the right time, before it's too late.
Yes. ProPlot's audit system lets you capture evidence continuously throughout the superstructure phase. As wall ties go in, photograph them. As lintels are set, document them. Every photo is automatically linked to the plot and stage.
Yes. ProPlot integrates build programme scheduling with inspection evidence. Your superstructure stage in the programme aligns with the evidence trail — so you can verify completion against actual photographic proof.
GPS-verified, stage-linked, audit-ready. 7-day free trial.
Discover how ProPlot covers every corner of UK site management.
Part L photographic evidence requirements.
Cut evening admin and automate reporting.
Build, slip and share 52-week programmes.
NHBC inspections, Part L evidence and audit trails.
Offline audits, GPS snagging and contractor portals.
Get practical tips for UK site managers — programme hacks, compliance shortcuts and feature updates. No spam.