Maximum
England
Spacing between drainage access points
45 m
Straight run of buried drain between access points
Greatest distance permitted between rodding points, access fittings or inspection chambers on a drain run.
Basis in regulation
How to check it on site
Walk the drain layout against the as-built drawing before covers are set to finished level. Confirm every change of direction and junction can be rodded.
Common failure
Bends added on site to dodge an obstruction, leaving a length that cannot be rodded from either end.
Last updated 23 August 2026. This is our editorial summary of publicly available regulation, not building control approval or a warranty determination.