Hybrid roof ventilation and AVCL
25 mm
Hybrid roof constructions require a minimum 25mm clear airflow path below the underlay to ensure effective ventilation
Every figure for this topic is on one page: Roof void ventilation, access and fire compartmentation
Read the full answerHybrid roof constructions require a minimum 25mm clear airflow path below the underlay to ensure effective ventilation. When a continuous air and vapour control layer (AVCL) is not practical to install, increased high-level ventilation of 5,000mm²/m is necessary to compensate for the reduced vapour resistance.
Basis in regulation
BS 5250
Read the source
How to check it on site
Ensure a consistent 25mm clear air gap is maintained below the underlay and confirm the presence and integrity of the AVCL or compensatory increased ventilation.
Common failure
The 25mm air gap is often obstructed by insulation or battens, and AVCLs can be poorly taped or damaged, compromising moisture control.
Last updated 23 August 2026. This is our editorial summary of publicly available regulation, not building control approval or a warranty determination.