Minimum
    England

    Flue outlet height at a ridge

    600 mm

    Solid fuel flue passing through a pitched roof at the ridge

    Height a solid fuel flue must terminate above the ridge where it passes through the roof at or near the ridge.

    Basis in regulation

    How to check it on site

    Check the terminal height from the ridge line once scaffold is still standing — it is expensive to correct afterwards.

    Common failure

    Chimney built to a height that looks right in elevation but falls short once the ridge tile is bedded.

    Last updated 23 August 2026. This is our editorial summary of publicly available regulation, not building control approval or a warranty determination.

    Related dimensions at this stage

    We use cookies to keep you logged in and improve ProPlot. Privacy Policy