Programme + Audits in one app

    Site Audit Software With an Integrated 52-Week Construction Programme

    Tired of running audits in one app and your build programme in a separate Excel spreadsheet? ProPlot combines both into a single platform — with a Slip tool that reschedules 100+ plot dates in one second.

    One App Instead of Two

    Auto-Scheduling Engine

    Generate a full 52-week programme from your stage template. Supports external, internal, and combined backward planning from a target completion date.

    The Slip Tool

    Select a delay reason — Weather, Trade no-show, Material delay — and push all affected dates forward in one tap. The programme maintains all stage dependencies automatically.

    Professional Exports

    Generate Excel files with frozen headers, autofilters, and dedicated slip-log worksheets. Give your build director forensic-level delay data.

    Side-by-Side Comparison

    See why site managers are consolidating their tools with ProPlot.

    FeatureSite Audit ProProPlot
    52-week build programmeNone — requires separate ExcelFully integrated with auto-scheduling
    Slip / delay toolNot availableMoves 100+ plot dates in one second
    Audit systemGeneric checklistsTrade-specific with GPS photo evidence
    Backward planningNoReverse-calculates start dates from completion targets
    Contractor schedule sharingNoLive filtered links — no login required
    Status history exportsBasicProfessional .xlsx with slip log worksheets
    Offline modeWeb-dependentNative offline shell with auto-sync
    Construction stagesNone91-stage masonry engine
    Price£50–£150+/moFree in beta with price lock

    Everything Included

    52-week auto-scheduling with backward planning
    Slip tool — reschedule 100+ plots in one second
    GPS-tagged audit photos with offline capture
    Trade-filtered contractor sharing portals
    Professional Excel exports with slip history
    Split-day AM/PM concurrent task tracking
    Custom unit prefixes (Plot, Unit, Villa)
    Unlimited photo storage included
    NHBC quality gate checklists
    Native Android offline shell

    Frequently Asked Questions

    How does the Slip tool save time?

    Instead of manually updating every plot date in Excel when a delay occurs, the Slip tool lets you select the reason and number of days — then recalculates your entire programme instantly while preserving all stage dependencies and recording the reason for your audit trail.

    Can I do backward planning?

    Yes. Set your target completion date and ProPlot reverse-calculates the internal start date, anchoring your external roof finish. You can select specific anchor and end stages for precision planning.

    What exports are available?

    ProPlot generates professional Excel workbooks with frozen headers, autofilters, per-plot programme schedules, and dedicated worksheets for status history and slip logs with full delay reason tracking.

    Stop Juggling Two Systems

    Combine your site audits and build programme in one construction-specific platform.

    Start Your Free Trial

    We use cookies to keep you logged in and improve ProPlot. Privacy Policy