AM/PM Split Day Task Manager for Site Activities
Book NHBC Inspection AM and Wardrobe Install PM on the same plot. ProPlot's Split Day Editor handles concurrent trades, inspections, and installations — with anchored overrides that survive programme slips. Built into a 52-week scheduling engine.
Split-Days + Site Activities
Split Day Editor
Book two concurrent tasks on the same day. The editor filters available stages by foundation type and construction method. Anchored entries stay fixed during programme slips.
Site Activities Catalog
NHBC/LABC inspections, scaffold checks, air testing, wardrobes, meter installs, fire stopping, snagging, handover — all built in. Reorder with up/down buttons, rename inline.
Dynamic Inspector Naming
The Inspection activity automatically renames based on your project's Building Inspector setting. Set "LABC" and it becomes "LABC Inspection" everywhere — no manual renaming.
Side-by-Side Comparison
Generic task apps don't understand construction scheduling.
| Feature | Generic Task Apps | ProPlot |
|---|---|---|
| AM/PM task splitting | Not available | Split Day Editor with anchored overrides |
| Site activities catalog | No construction logic | Inspections, installations, and maintenance tasks |
| Concurrent trade booking | Cannot represent | Wardrobes + 1st Fix Joinery on same day |
| Programme integration | Separate system | Split-days sit within 52-week schedule |
| Anchored entries | No | Fixed during programme slips |
| Activity reordering | No | Up/Down buttons with inline renaming |
| Excel export of splits | No | "Task 1 | Task 2" with gradient fills |
| Building inspector naming | No | Dynamic LABC/NHBC naming from settings |
| Offline support | Web-dependent | Full offline with native Android shell |
| Price | £50–£150+/mo | Free in beta |
Built-In Site Activities
Frequently Asked Questions
Can I add custom activities?
Yes. The Site Activities catalog is fully customisable. Add new activities, reorder them with up/down buttons, and rename inline. Custom activities work just like built-in ones — they can be assigned as split-day segments or full-day entries.
How do I access activities on the programme?
Activities are available via a dedicated toggle in the stage selection menu. Switch to the Activity view to see all available activities, then assign them to specific dates. A back-navigation button returns you to the regular stage list.
Do split-day activities export properly?
Yes. Split entries appear as "Task 1 | Task 2" in Excel with gradient fills. In PDF reports, both activities appear with their full details. The formatting is clean and professional for director reviews.
Two Tasks. One Day. Zero Compromise.
Split-day scheduling with built-in site activities for real construction complexity.