AM/PM concurrent task tracking

    Split Day Site Manager App for AM and PM Task Tracking

    Generic apps can't handle concurrent tasks like Wardrobe Installs happening alongside 1st Fix Joinery. ProPlot's Split Day Editor allows manual tactical bookings without breaking the master auto-programme.

    Why Split-Day Matters on Real Sites

    Concurrent Trade Booking

    Book two trades on the same day — Wardrobes AM, 1st Fix PM. The Split Day Editor filters available stages by foundation type and construction method to prevent clutter.

    Anchored Overrides

    Split-day entries are anchored to their specific dates. When you use the Slip tool to push the programme, anchored entries stay fixed while everything else adjusts.

    Professional Excel Output

    Split entries export as "Task 1 | Task 2" with gradient fills. Your build director sees a clean, professional schedule — not a confusing overlap.

    Side-by-Side Comparison

    Generic audit tools weren't built for construction scheduling complexity.

    FeatureSite Audit ProProPlot
    Split-day schedulingNot availableAM/PM concurrent task tracking per plot
    Concurrent tradesNo construction logicWardrobe Install + 1st Fix Joinery on same day
    Auto-programmeNone91-stage engine with auto-fill scheduling
    Manual overridesN/AAnchor split-days to prevent shifting during slips
    Slip toolNoReschedule 100+ plots in one tap
    Excel export of splitsNo"Task 1 | Task 2" with gradient fills
    Offline field useWeb-reliantNative Android offline shell
    Price£50–£150+/moFree in beta

    Frequently Asked Questions

    What trades can I split on one day?

    Any two stages from your programme. Common examples include Wardrobe Installs + 1st Fix Joinery, Kitchen Fit + 2nd Fix Plumbing, or Decoration + Carpet Laying. The editor dynamically filters options based on your plot's foundation type.

    Do split-days break the auto-scheduler?

    No. Split-day entries are manually anchored — they coexist with the auto-generated programme without conflict. The Slip tool respects anchored entries and adjusts everything else around them.

    Can contractors see split-day assignments?

    Yes. When you share filtered schedule links, contractors see their assigned tasks including split-day bookings with the relevant time slot context.

    Handle Real-World Scheduling Complexity

    ProPlot's split-day scheduling was built for the reality of running a construction site.