Track Plot Build Progress From Foundations to CML
See every plot's journey from foundation dig to CML sign-off. ProPlot's 91-stage masonry engine gives you stage-level visibility, quality gate milestones, and forensic delay tracking — so you always know which plots are on track and which are blocked.
Full Lifecycle Plot Tracking
91-Stage Build Engine
Covers every stage from foundation dig through brickwork, first fix, second fix, decoration, and CML sign-off. Stages filtered by foundation type and construction method to prevent clutter.
Quality Gate Milestones
Key checkpoints — Air Testing, Solar Commissioning, Pre-Plaster, CML — with GPS-tagged photo evidence. See at a glance which plots are approaching completion and which are stuck.
Programme Status Grid
Every plot, every stage, one view. Current progress, upcoming milestones, completion forecasts, and delay reasons — the overview your build director needs.
Side-by-Side Comparison
Generic tools count snags. ProPlot tracks your entire build lifecycle.
| Feature | Site Audit Pro / Generic Tools | ProPlot |
|---|---|---|
| Foundation-to-CML tracking | No construction stages | 91-stage masonry engine with full lifecycle |
| Progress visualisation | Snag counts only | Stage-by-stage plot progression |
| Quality gates | Generic checklists | Air Testing, Solar, Pre-Plaster, CML Sign-off |
| Auto-scheduling | None | 52-week programme from templates |
| Foundation type filtering | No | Stages filtered by foundation type |
| Delay impact on milestones | Not tracked | Slip tool recalculates with reason logging |
| Multi-plot status overview | No | Programme status grid across all plots |
| Contractor notifications | Limited | Trade-filtered sharing via WhatsApp/SMS/Email |
| Excel progress exports | Basic PDF | Professional .xlsx with history worksheets |
| Price | £50–£150+/mo | Free in beta |
Complete Progress Toolkit
Frequently Asked Questions
Can I customise the 91 stages?
Yes. Create custom house type templates with different stage sequences and durations. Foundation type filtering ensures each plot shows only relevant stages for its construction method. Custom trades can be added to the system.
How do I know which plots are falling behind?
The Programme Status grid highlights delayed plots with slip reasons. The status history tracks every transition with timestamps, so you can see exactly when and why a plot fell behind schedule. Export this data to Excel for board presentations.
Does it track the reason for every delay?
Yes. Every slip event records the reason (Weather, Trade no-show, Material delay, or custom), the number of days, the contractor involved, and the timestamp. This builds a forensic audit trail over the life of your project.
Every Plot. Every Stage. Every Milestone.
Foundation to CML — tracked, measured, and exportable.
Start Your Free Trial