Minimum
    England

    Cavity drainage and DPC extension

    150 mm

    Cavities in external walls must extend at least 150mm below the damp-proof course (DPC) level to allow for proper drainage and collection of moisture

    Every figure for this topic is on one page: Cavity trays and DPC: where are they needed and how high?

    Read the full answer

    Cavities in external walls must extend at least 150mm below the damp-proof course (DPC) level to allow for proper drainage and collection of moisture. The cavity must be kept clear of obstructions and equipped with weep holes or other suitable means to permit moisture to escape externally.

    Basis in regulation

    How to check it on site

    Check that the cavity extends sufficiently below the DPC and that weep holes are correctly spaced, unobstructed, and clear of mortar.

    Common failure

    Blocked weep holes or an insufficient cavity depth below the DPC can lead to moisture accumulation within the cavity.

    Last updated 23 August 2026. This is our editorial summary of publicly available regulation, not building control approval or a warranty determination.

    Related dimensions at this stage

    We use cookies to keep you logged in and improve ProPlot. Privacy Policy