Maximum
    England

    Cavity tray installation and weep holes

    450 mm

    Weep holes at not more than 450 mm centres, with at least two over every opening

    Every figure for this topic is on one page: Cavity trays and DPC: where are they needed and how high?

    Read the full answer

    Cavity trays are essential elements for preventing moisture penetration, particularly over openings or where the cavity is bridged. They must be installed correctly to the specified profile, with upstand ends to contain water, and kept free of obstructions. Weep holes are critical for allowing water collected by the tray to drain externally, typically spaced at maximum 450mm centres with a minimum of two per tray. Preformed trays are often used for complex geometries like bay windows, and the detail should be chosen based on the site's exposure conditions.

    Basis in regulation

    How to check it on site

    Check correct installation and profile of cavity trays, ensure ends are turned up, the tray is clean, and weep holes are present, clear, and correctly spaced.

    Common failure

    Blocked or incorrectly installed cavity trays and missing or blocked weep holes, leading to internal dampness.

    Last updated 2 September 2026. This is our editorial summary of publicly available regulation, not building control approval or a warranty determination.

    Related dimensions at this stage

    We use cookies to keep you logged in and improve ProPlot. Privacy Policy