Air temperature limits for laying masonry
Stop at 3 °C and falling; do not restart below 1 °C rising
Masonry and render work in cold weather.
Do not lay masonry when the air temperature is 3 °C or below and falling, or when it is below 1 °C, unless the work is heated and protected. Newly laid work should be covered until the mortar has set.
Basis in regulation
BS 8000-3
Read the source
How to check it on site
Check hessian or frost blankets are on the work at the end of the shift, not folded on the scaffold.
Common failure
Mortar laid in a frost and left uncovered overnight, crumbling out of the joints days later.