    Air temperature limits for laying masonry

    Stop at 3 °C and falling; do not restart below 1 °C rising

    Masonry and render work in cold weather.

    Do not lay masonry when the air temperature is 3 °C or below and falling, or when it is below 1 °C, unless the work is heated and protected. Newly laid work should be covered until the mortar has set.

    Basis in regulation

    How to check it on site

    Check hessian or frost blankets are on the work at the end of the shift, not folded on the scaffold.

    Common failure

    Mortar laid in a frost and left uncovered overnight, crumbling out of the joints days later.