Weep hole spacing above a cavity tray
900 mm maximum centres, with at least two weep holes over every opening
Over lintels, cavity trays and at the base of the cavity
Every figure for this topic is on one page: Cavity trays and DPC: where are they needed and how high?
Read the full answerMaximum spacing of weep holes provided to drain a cavity tray or the base of a cavity.
Basis in regulation
How to check it on site
Count weep holes over each opening as the outer leaf is built. They must sit in the course immediately above the tray, not one or two courses higher.
Common failure
Weep holes omitted over narrow openings, or formed above the tray so water collects and tracks inwards.