Technical answer

    Cavity barriers and fire stopping around openings and services

    Cavity barriers are required continuously around the full perimeter of every opening in a cavity wall, at the edges of cavities, and at every compartment junction. Where a service passes through a fire-resisting element, the fire stopping has to reinstate the full fire resistance of that element using a system tested in that substrate.

    The figures on one page

    Cavity barriers and fire stopping around openings and services — published figures
    ItemLimitFigure
    Cavity barriers around openings in a cavity wallIncludes windows, doors, and any duct or vent passing through the cavityMinimumContinuous around the full perimeter of the opening
    Cavity barriers at timber frame panel junctionsBarriers tight to both faces of the cavity, fixed and continuousMaximumAt every compartment junction and opening edge
    Fire stopping at a service penetrationSealed with a system tested for that substrate, aperture size and service typeMinimumReinstate the full fire resistance of the element
    Cavity subdivision in a roof voidMaximum distance between cavity barriers in a concealed roof spaceMaximum20 m
    Door Clearances and Fire Door InstallationInternal doors, including fire doors, must be installed with sufficient clearance from the finished floor level to accommodate flooring, typically around 10mm for non-fire doorsexact10 mm
    Fire resistance of a compartment floor between flatsIncludes the ceiling line, service voids and any penetrations through itMinimum60 minutes
    Maximum pipe diameter through a compartment wall or floorNominal internal diameter for a non-fire-rated pipe; larger pipes need a tested sleeve, collar or non-combustible materialMaximum40 mm

    What this means on site

    The most common cause of a failed fire stopping inspection is not the missing barrier but the wrong product: a sealant tested in blockwork used in plasterboard, or a collar sized for a different pipe diameter.

    Barriers must be tightly fitted with no gaps at joints, and fixed so they cannot slump into the cavity over time.

    What actually gets picked up

    • Barrier stopped short at the head or sill of an opening, leaving a clear path up the cavity.
    • Expanding foam used as fire stopping where a tested system is required.
    • Penetrations formed after the barrier was installed and never made good.
    • No evidence retained — no photographs of the barrier before it was closed in.

    Questions we get asked

    Where are cavity barriers required?
    Around the full perimeter of every opening, at the edges of cavities, at compartment junctions, and subdividing large cavities including roof voids.
    What counts as acceptable fire stopping?
    A system tested in the same substrate and configuration that reinstates the full fire resistance of the element being penetrated.
    How is fire stopping evidenced at inspection?
    Photographs before close-in, product data for the tested system, and a record of the location — this is normally requested at pre-plaster.

    Where this is inspected

    This is ProPlot's editorial summary of publicly available UK regulation and good practice. It is not building control approval or a warranty determination, and the designer's or manufacturer's tighter figure always takes precedence.

    We use cookies to keep you logged in and improve ProPlot. Privacy Policy