Ready-mixed concrete temperature and curing
5 °C
Ready-mixed concrete delivered to site should have a minimum temperature of 5°C, as specified in BS EN 206
Ready-mixed concrete delivered to site should have a minimum temperature of 5°C, as specified in BS EN 206. During cold weather, curing periods must be adjusted to environmental conditions, and newly placed concrete must be insulated or heated to maintain its temperature above freezing. It is imperative that concrete is not placed on frozen ground or surfaces, and care must be taken when placing fresh concrete against colder, hardened sections.
Basis in regulation
BS EN 13670
Read the sourceBS EN 206
Read the source
How to check it on site
Verify delivery tickets show concrete temperature is at least 5°C, and check that insulation or heating is applied to new pours, especially on cold substrates.
Common failure
Inadequate protection of newly placed concrete leading to freeze-thaw damage or delayed strength development.
Last updated 23 August 2026. This is our editorial summary of publicly available regulation, not building control approval or a warranty determination.