DPC and DPM Lapping in Timber Frame
100 mm
Every figure for this topic is on one page: Cavity trays and DPC: where are they needed and how high?
Read the full answerDPCs must be installed at openings to prevent rain penetration and over horizontal timber cavity barriers. At ground floor level, DPCs are fitted below sole plates and should lap with the DPM and air and vapour control layer (AVCL) by at least 100mm to ensure airtightness and moisture protection.
Basis in regulation
How to check it on site
Check that DPCs are correctly installed at openings, over cavity barriers, and adequately lapped with the DPM/AVCL at sole plate level.
Common failure
Inadequate lapping or incorrect installation of DPCs and DPMs compromises the building's airtightness and moisture resistance.
Last updated 2 September 2026. This is our editorial summary of publicly available regulation, not building control approval or a warranty determination.