Damp-proof membrane lap and seal
150 mm
Ground-supported slab, membrane above or below the concrete
Every figure for this topic is on one page: Cavity trays and DPC: where are they needed and how high?
Read the full answerMinimum lap where sheets of damp-proof membrane meet, and the requirement to seal the membrane to the damp-proof course.
Basis in regulation
How to check it on site
Check laps before concrete is poured or the slab is covered. Every lap should be taped or welded, and the membrane carried up and sealed into the DPC at the perimeter.
Common failure
Membrane torn by reinforcement or barrow traffic, or finished short at the perimeter so the slab edge stays open to ground moisture.