Why blocks are inspected differently to houses: compartmentation and fire stopping, sound testing, communal areas, per-unit records and phased handovers.
Reviewed by the ProPlot site team
In short
On apartment blocks NHBC inspect each unit against the same key stages as a house, but the risk sits in the shared construction: compartmentation, fire stopping, separating walls and floors, and communal areas. Records have to be per unit, and the pre-handover position is complicated by phased handovers and shared plant that is not finished.
A house is a single, self-contained unit and the inspection sequence follows it from the ground up. A block is dozens of units sharing a structure, a fire strategy, an acoustic strategy and a set of risers. The inspection risk moves from the individual dwelling to the interfaces between them.
That changes the shape of the Bespoke Technical Risk Management Plan. Expect more Risk Based Inspections concentrated on compartmentation, fire stopping, separating construction and the sequencing of trades through risers and corridors — the places where three subcontractors work on the same penetration.
It also changes the record keeping. Every unit needs its own inspection record and its own evidence, even where the construction is identical, because each unit gets its own warranty.
This is the single highest-risk area on a block and the one that generates the most severe Reportable Items. Compartmentation only works if it is continuous, and it is broken by every service that crosses it — which is most of them.
The practical problem is sequencing. A penetration is often made by one trade, used by a second, and fire stopped by a third, sometimes weeks apart. If nobody owns the closing-out of each penetration, the block ends up with a scatter of untreated holes that are extremely expensive to find and prove after the ceilings go in.
Separating construction has to meet Part E, either by pre-completion sound testing or by using Robust Details. Both routes are inspected, and both are unforgiving of small deviations — a rigid connection between leaves, a service chased into a separating wall, or a missed flanking detail can fail a whole floor.
Where Robust Details are registered, the inspector checks the construction matches the registered detail exactly. A deviation does not just produce an RI; it invalidates the registration and forces you into pre-completion testing you had not programmed.
Sound testing is done on a sample, but a failed sample condemns the units it represents. Get the first-of-type built carefully and inspected hard.
Corridors, cores, stairs, lift lobbies, bin and cycle stores, plant rooms and roof areas all form part of the inspected works, and they are habitually the last things finished because no individual unit handover depends on them — right up until the point every handover depends on them.
Communal areas also carry their own compliance load: emergency lighting, smoke ventilation, fire doors and signage, access and means of escape. These are inspected and they need commissioning evidence like anything else.
Blocks are usually handed over in phases: a core, a floor, or a stack at a time. That means the pre-handover position has to be assessed per unit while the building around it is still a construction site.
Practically, that requires unit-level discipline. Each apartment needs its own key stage record, its own photographic evidence, its own commissioning certificates and its own closed-out RIs. A block-level folder is not enough — at the point of sale, a conveyancer is asking about one flat.
It also requires protection. Completed units on a floor still being worked cause more damage snags than anything else on a block, and damage found at pre-handover is your problem, not the trade’s.
ProPlot logs every key stage check, GPS-stamped photo and Reportable Item against the plot, so nothing has to be recreated after the event. Free while in beta.
Create a free accountDiscover how ProPlot covers every corner of UK site management.
Part L photographic evidence requirements.
Cut evening admin and automate reporting.
Build, slip and share 52-week programmes.
NHBC inspections, Part L evidence and audit trails.
Offline audits, GPS snagging and contractor portals.
Get practical tips for UK site managers — programme hacks, compliance shortcuts and feature updates. No spam.