Twelve stage guides, every check traceable, nothing copied. This page sets out where the material comes from, what we deliberately will not publish, and how it is kept current.
Openly published sources first
Numbers and requirements are traced to the Building Regulations Approved Documents, British Standards and other openly published guidance. Those are the documents we cite, because those are the documents you can go and read.
Proprietary material stays closed
Warranty standards and housebuilder quality manuals are copyright. We read them to know what is assessed, and we write our own guidance covering the same ground. We do not quote them, reproduce their tables or republish their figures.
Written by people who have done the visits
The checks, the failure notes and the "above and beyond" items come from running key stage inspections on UK housing sites — not from rewriting other websites.
Dated and reviewed
Every guide shows the date it was last reviewed. We revisit when an Approved Document changes, when the warranty inspection process changes, and on a rolling review otherwise.
Each stage page is assembled from five layers. The compliance checklist, grouped by the way work actually happens on site, with the standard or Approved Document behind each check. The process layer — notice, inspection type, what gets recorded and what the visit signs off. The evidence layer — the paperwork the inspector will ask for and the moments in time worth photographing before they are covered. The numbers layer, drawn from our critical dimensions library. And the quality layer — the protection and presentation work that no inspector will fail you for, but which decides whether the plot hands over clean.
Every diagram on the stage guides is drawn by us, from geometry described in openly published documents. None is traced from or adapted from a warranty provider figure or a housebuilder manual. They are indicative: build to the approved drawings for the plot.
If you think something on a guide is wrong, tell us and we will check it against the source and either correct it or explain the basis. Send us a correction.
Excavation & foundations
21 checks →
Drainage
20 checks →
Basement / lower ground
28 checks →
Ground Floor & Slab
19 checks →
Superstructure
22 checks →
Timber Frame Erection
21 checks →
Roof
22 checks →
Windows and External Doors
24 checks →
Insulation & Airtightness
23 checks →
First Fix
28 checks →
Fire Stopping
22 checks →
Pre-Plaster
21 checks →
Second Fix
31 checks →
External Works & Pre-Handover
23 checks →
Pre-handover
22 checks →
General Quality
20 checks →
Discover how ProPlot covers every corner of UK site management.
Part L photographic evidence requirements.
Cut evening admin and automate reporting.
Build, slip and share 52-week programmes.
NHBC inspections, Part L evidence and audit trails.
Offline audits, GPS snagging and contractor portals.
Get practical tips for UK site managers — programme hacks, compliance shortcuts and feature updates. No spam.